Terms
Home / Terms
The pages describe door fitting: measuring openings, hanging leaves and frames, and adjusting doors that can still be saved. A message sent through the form is a request for a survey, not a confirmed booking and not a fixed price.
Any figure discussed after a survey applies to the opening that was measured. Fire doors are supplied and hung as certified sets when that is what the opening needs. Civil defence approval of a building stays with the authority and the project drawings. It is not issued by this website.
Apartment towers may require a work permit and a service lift. If management refuses the door you want, the visit stops at that point rather than hanging a leaf the building will not accept. Garage sectional doors, gate motors and structural concrete openings are outside the work.
A request is not a booking
A message sent through the form is a request for a survey, not a confirmed booking and not a fixed price.
After the survey
Any figure discussed after a survey applies to the opening that was measured.
Fire doors and approval
Fire doors are supplied and hung as certified sets when that is what the opening needs. Civil defence approval of a building stays with the authority and the project drawings. It is not issued by this website.
Outside this work
Garage sectional doors, gate motors and structural concrete openings are outside the work. If building management refuses the door, the visit stops there.
- Enquiry form used for surveys and for review comments
- No sale of enquiry details
- Service descriptions sit on the service pages
- Civil defence approval is not issued here
Questions about these terms
A message sent through the form is a request for a survey, not a confirmed booking and not a fixed price.
Civil defence approval of a building stays with the authority and the project drawings. It is not issued by this website.
Garage sectional doors, gate motors and structural concrete openings are outside the work.
If management refuses the door you want, the visit stops at that point rather than hanging a leaf the building will not accept.
No. A fire door is a tested set: leaf, frame, seals and ironmongery. It is not trimmed on site, and a bedroom latch is not swapped onto it. Bedroom doors are ordinary joinery. Stair and corridor doors follow the fire drawing.
Dubai, Abu Dhabi, Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah, Fujairah and Al Ain, plus the communities on the areas page. Tower jobs need a lift booking. Villa jobs need a clear carry from the gate and the porch level.
Other fittings
Contact
Garage sectional doors, gate motors and structural concrete openings are outside the work. If building management refuses the door, the visit stops there.